Stage 8 Construction Update | Велика Британія
To the news list

Stage 8 Construction Update

January 21, 2026

Construction works within Stage 8 of the Velyka Brytaniia Residential Complex are progressing as planned.

In Section 2, wall plastering works are ongoing. Floor tiling in common areas has been completed, with the exception of the ground floor. Installation of water and heat meters has been fully completed.

In Section 1 (1.2), internal partition masonry and window installation have commenced. At the same time, installation of internal water supply and heating systems is ongoing. Façade insulation and finishing works continue. External wall masonry has been completed at the ninth-floor level above the car park, while internal wall masonry is in progress at the third-floor level.

Works on the vertical structural elements of the commercial floor above the stylobate car park have been completed.

Velyka Brytaniia is a British-style residential complex that combines well-considered layouts, modern engineering solutions, and restrained architectural design. The project is located in a convenient area with excellent transport accessibility, creating a comfortable environment for everyday living.

For detailed information on purchase conditions, please contact our sales offices. Up-to-date contact details are available via the link.

We will call you back, advise, select the best options
Phone number *
Thank you for your application! We will contact you shortly.
This site uses cookies for more comfortable work of the user. By continuing to browse the site, you agree to the use of cookies.